99905银河·(中国区)官方网站-Twinkling Star

Raise Boring Division

-
首页/Typical Project/Domestic Projects Under Construction

Raise Boring Division

Work Description: Various raise boring works

Established in: Sept 2013 


On September 5th 2013, Beijing JCHX Raise Boring Company Limited was established and put into operation in Miyun District of Beijing with registered capital of CNY 50 million, with a purpose of undertaking raise boring works as required for the construction of ore passes, ventilation raises, man pass, pipe and cable raises, drainage holes, lift shaft, etc. With 10+ raise boring machines including TR-3000 imported from Australia, CY-R120VD and ZFY series machine from Chinese suppliers, JCHX raise boring division is capable of raise boring over 10000m per year. Its previous work at Changlongshan pump-storage power station is with biggest installed capacity in China, the incline shaft is 406m long with an inclination of 58°, also the longest one in China.

Since 2020, Raise Boring Division has made remarkable achievements at Baiyu Project, Xitieshan Project, Subei Project, Huibaoling Project, Dong’An Gold Mine Project and other external works with multiple high-quality breakthroughs completed.

时间:2020-09-27   访问量:316

上一篇:Lujiang Pyrite Mine Project

下一篇:Electrical & Mechanical Installation Division

投资者关系
协同办公
联系我们

电话:010-83203999

传真:010-83203999-9752

E-mail:jchx@jchxmc.com

地址(密云办公区):北京市密云区经济开发区水源西路28号

邮编:101500

地址(丰台办公区):北京市丰台区育仁南路三号楼99905银河大厦

邮编:100070


公众号 99905银河JCHX
友情链接: 北京99905银河矿业管理技术有限公司
Copyright © 2018-2020 JCHX Mining Management Co Ltd. All Rights Reserved. 备案号码:京ICP备08105072号
XML 地图