Description: Sinking and Lining of Main Shaft at Zhuguolijia Gold Mine of Laizhou Jinsheng Mining Investment Limited
Owner: Laizhou Jinsheng Mining Investment Limited
The project, adjacent to JCHX’s Huijin project, is located at Jiaodong Peninsula of Shandong Province, the world’s third largest gold mines complex. It is a key project of Shandong Gold, designed with a capacity of 5000 tpd.
The work scope mainly includes the development of main shaft (Φ8.0m and 1307m deep), insets (2 schemes), skip loading chamber, weighing chamber and crosscut, with a total duration of 595 calendar days.
电话:010-83203999
传真:010-83203999-9752
E-mail:jchx@jchxmc.com
地址(密云办公区):北京市密云区经济开发区水源西路28号
邮编:101500
地址(丰台办公区):北京市丰台区育仁南路三号楼99905银河大厦
邮编:100070