99905银河·(中国区)官方网站-Twinkling Star

Jinsheng Gold Mine Project

-
首页/Typical Project/Domestic Projects Under Construction

Jinsheng Gold Mine Project

Description: Sinking and Lining of Main Shaft at Zhuguolijia Gold Mine of Laizhou Jinsheng Mining Investment Limited

Owner: Laizhou Jinsheng Mining Investment Limited


The project, adjacent to JCHX’s Huijin project, is located at Jiaodong Peninsula of Shandong Province, the world’s third largest gold mines complex. It is a key project of Shandong Gold, designed with a capacity of 5000 tpd.

The work scope mainly includes the development of main shaft (Φ8.0m and 1307m deep), insets (2 schemes), skip loading chamber, weighing chamber and crosscut, with a total duration of 595 calendar days.


时间:2022-05-07   访问量:143

上一篇:Weng’an Phosphate Mine Project

下一篇:Jiaojia Gold Mine Project

投资者关系
协同办公
联系我们

电话:010-83203999

传真:010-83203999-9752

E-mail:jchx@jchxmc.com

地址(密云办公区):北京市密云区经济开发区水源西路28号

邮编:101500

地址(丰台办公区):北京市丰台区育仁南路三号楼99905银河大厦

邮编:100070


公众号 99905银河JCHX
友情链接: 北京99905银河矿业管理技术有限公司
Copyright © 2018-2020 JCHX Mining Management Co Ltd. All Rights Reserved. 备案号码:京ICP备08105072号
XML 地图