99905银河·(中国区)官方网站-Twinkling Star

Jiaojia Gold Mine Project

-
首页/Typical Project/Domestic Projects Under Construction

Jiaojia Gold Mine Project


Description: Sinking and Lining of Air Return Shaft at Jiaojia Gold Mine

Owner: Shandong Gold Mining (Laizhou) Co., Ltd.


The air return shaft, located in Jiaodong Peninsula of Shandong province (the 3rd largest gold occurrence area), is the fourth large and deep shaft developed by JCHX at the same area, following the service shaft and the air intake shaft at Shaling Gold Mine and the main shaft at Zhuguolijia Gold Mine. According to mining industry statistics, this shaft is currently one of the biggest shafts in China with a net diameter of Φ11m. The scope of work includes shaft sinking and lining (shaft depth 951m), insets development and other auxiliary works. The contract period is 500 calendar days.


时间:2023-08-14   访问量:74

上一篇:Jinsheng Gold Mine Project

下一篇:Jigongling Phosphate Mine Project

投资者关系
协同办公
联系我们

电话:010-83203999

传真:010-83203999-9752

E-mail:jchx@jchxmc.com

地址(密云办公区):北京市密云区经济开发区水源西路28号

邮编:101500

地址(丰台办公区):北京市丰台区育仁南路三号楼99905银河大厦

邮编:100070


公众号 99905银河JCHX
友情链接: 北京99905银河矿业管理技术有限公司
Copyright © 2018-2020 JCHX Mining Management Co Ltd. All Rights Reserved. 备案号码:京ICP备08105072号
XML 地图